PublicPutrajaya LineProject Updates

Project Updates

The Putrajaya Line Project Updates provides the latest project construction progress updates based on the type of alignment and location of the sites. You may also view the locations and status of project from our Project Interactive Map.

Jalan Kepong (Metro Prima)

September 2020

Backfilling and compaction works in progress for the Multi Storey Park and Ride …

PLUS Highway (Sg Buloh Toll)

June 2020

View of the ongoing trackworks at the alignment near ramp to Sungai Buloh Toll. …

Jalan Kuala Selangor (Damansara Damai)

June 2020

View of the external façade works in progress for Damansara Damai MRT Station e…

Persiaran Dagang (Sri Damansara Sentral)

June 2020

Covered walkway installation in progress at the Sri Damansara Barat MRT Station …

Jalan Kepong (Sri Damansara Timur)

June 2020

Aerial view of the Sri Damansara Timur MRT Station showing the completed install…

Jalan Kepong (Kepong Baru)

June 2020

Aerial view of the Kepong Baru MRT Station site showing the installation of colu…

Jalan Kepong (Jinjang)

June 2020

Aerial view of the Jinjang MRT Station site showing Entrance 1 and 2 structural …

Jalan Kepong (Sri Delima)

June 2020

Drainage works in progress at the Sri Delima MRT Station…

Jalan Kampung Batu (Kampung Batu)

June 2020

Tile grouting works in progress at the Kampung Batu MRT Station site.…

Jalan Ipoh (Kentonmen)

June 2020

Aerial view of the Kentonmen MRT Station site showing the south steel bridge ins…

Jalan Ipoh (Jalan Ipoh)

June 2020

View of the excavation works, wall below platform casting, earth mat works and s…

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

June 2020

Aerial view of the Escape Shaft 1 showing the 200t and 600t crane on site for Tu…

Jalan Sultan Azlan Shah (Sentul Barat)

June 2020

Overhead Tunnel Exhaust shoring system installation at the Sentul Barat MRT Stat…

Jalan Tun Razak (Titiwangsa)

June 2020

Aerial view of the Titiwangsa MRT Station site.…

Jalan Tun Razak (Hospital Kuala Lumpur)

June 2020

Platform reinforced slab and wall construction at the Hospital Kuala Lumpur MRT …