January 31, 2020
Pandangan udara kerja-kerja landasan sedang dijalankan di jajaran berhampiran tanjakan ke Tol Sungai Buloh

PLUS Highway (Sg Buloh Toll)

Aerial view of the trackworks in progress at the alignment near ramp to Sungai Buloh Toll.
January 31, 2020
Pandangan udara tapak Stesen MRT Damansara Damai menunjukkan kerja-kerja seni bina dan bumbung sedang dijalankan.

Jalan Kuala Selangor (Damansara Damai)

Aerial view of the Damansara Damai MRT Station site showing the architectural and roofing works in progress.
January 31, 2020
Pandangan udara tapak Stesen MRT Sri Damansara Barat menunjukkan kerja-kerja seni bina dan kalis tiris bumbung sedang dijalankan.

Jalan Kuala Selangor (Sri Damansara Barat)

Aerial view of the Sri Damansara Barat MRT Station site showing the architectural works and roofing flashing in progress.
January 31, 2020
Dinding tembok untuk tetingkat sedang dijalankan untuk aras ruang legar Stesen MRT Sri Damansara Timur.

Jalan Kepong (Sri Damansara Timur)

Aerial view of the Sri Damansara Sentral MRT Station site showing the architectural works and roofing flashing in progress.
January 31, 2020
Pemasangan kuasa rel sedang dijalankan di Stesen MRT Metro Prima.

Jalan Kepong (Metro Prima)

Power rail installation at the Metro Prima MRT Station.
January 31, 2020
Pemasangan kekoatak bunyi di atas pintu Kutipan Tambang Automatik sedang dijalankan di Stesen MRT Kepong Baru.

Jalan Kepong (Kepong Baru)

Installation of boombox above the Automatic Fare Collection gate in progress at the Kepong Baru MRT Station.
January 31, 2020
Pandangan udara tapak Stesen MRT Jinjang menunjukkan kerja-kerja melapik bumbung, fakad dan pemasangan kekotak bunyi sedang dijalankan.

Jalan Kepong (Jinjang)

Aerial view of the Jinjang MRT Station site showing the roof covering, façade and boombox installation works in progress.
January 31, 2020
Pandangan udara tapak Stesen MRT Sri Delima menunjukkan kerja-kerja penjubinan dan kabel kekotak bunyi sedang dijalankan.

Jalan Kepong (Sri Delima)

Aerial view of the Sri Delima MRT Station site showing the tiling works and boombox cable works in progress.
January 31, 2020
Pandangan udara Stesen MRT Kampung Baru menunjukkan kerja-kerja yang sedang dijalankan untuk penjubinan, kabel kekotak bunyi dan pemasangan rel.

Jalan Kampung Batu (Kampung Batu)

Aerial view of the Kampung Batu MRT Station showing the works in progress for tiling, boombox cable and railing installation.